Construction and operation following EBO BOStrab

Alignment

  • Independent
  • Extended radii (min.: 180m for secondary lines and 300m for main lines, exceptions down to 150m)
  • Slight slopes (max.: 40‰ for secondary lines and 12,5‰ for main lines)
  • In most cases with ballast superstructure
    to carry heavy axle loads (18-22,5t)
  • Double-tracked if required

  • Street level bounded to independent
  • Small radii (e.g. 25m)



  • Sheer slopes (up to 90‰) possible



  • Various roadbeds (pavement, lawn, ballast)
    to carry only light axle loads (<12t)
  • Generally double-tracked (Only in paticular exceptions single-tracked)

Speed

  • Secondary lines: 60-80km/h
  • Main lines: 120-160km/h
  • New and upgraded track sections: >200km/h

  • Innercity: 30-70km/h
  • Outskirts: 60-80km/h

Interval

  • "Operation in technical spacing"
    (Exceptions: shunting as well as operational trips (e.g. for maintenance))

  • "Operation on sight"
    (Exceptions: >70km/h, in tunnels and on single-tracked sections)

Signalling

  • Secondary lines: voice radio based operation (mostly signalled)
  • Main lines: generally signalled using local (from 100km/h) or continous automatic train running (above 160km/h)

  • Only on junctions, integrated into traffic lights

Rolling stock

  • Single-directional vehicles in single or double traction as well as locomotive-driven trains
  • Length: 70-210m (regional trains), 400m (high speed trains), 700m (freight trains)
  • Width: 3,29m
  • Access heights in most cases 60-100cm above track

  • Single-directional vehicles in single or double traction


  • Lenght: mostly 30 to 75m (maximum)


  • Width: 2,65m (maximum)
  • Access heights in most cases low (Karlsruhe: 35cm above track)

Traction

  • Steam
  • Diesel
  • Electrical using various power supply (mostly 15-25KV AC)

  • Generally electrical using 600-750V DC

Station

  • Platforms (up to 160 km/h) according to structure gauge of vehicles
  • main lines: mostly level-free access

  • Platforms (if existing) according to envelope of vehicles


  • Mostly level access

Level crossing

  • New ones not allowed
  • Manning follows local conditions, mostly technical manned by gates

  • New ones conditionally allowed
  • Manning follows local conditions, mostly technical manned by gates or traffic lights

   